|
Technical Papers |
|
Total 10 articles
found satisfying the criteria |
| |
Tunnelling
on Konkan Railway : Strategies and execution
B. Rajaram (February, 1994)
|
Tunnels
on Konkan Railway : Standardising cross sections
S.D. Limaye (February, 1994)
|
Tennelling
machinery for Konkan Railway project
V. Anand (February, 1994)
|
Construction
of 6.5-km long Karbude tunnel
B.R. Kulkarni (February, 1994)
|
Natuwadi
tunnel : Record progress through departmental work
P.T. Badhe and Virendra Kumar Verma (February, 1994)
|
Earthwork
on Konkan Railway : Salient features
S.G. Kelkar (February, 1994)
|
Design
of circular lining for shield-driven tunnel
S.D. Limaye and S.S. Narayanan (February, 1994)
|
Soft
soil tunnelling using shield for Honnavar tunnels
C. Raju, G. Narayanan and A.P. Kurien (February, 1994)
|
Ventilation
of long tunnels on Konkan Railway
I.D. Chopra (February, 1994)
|
Vertical
sand drains for railway embankment on marine clay
S.D. Limaye, J.K. Nandanwar and L.B. Srinivasan (February, 1994)
|