TECHNICAL PAPER



























                                       Figure 2: Metro Waste Handling Pvt Ltd C&D recycling facility in Thane


           2.3 Material control                                   The sample was analysed at the Bureau Veritas Construction
                                                                  Services Laboratory in Navi Mumbai. The properties determined
           Preparation of the fine RCA sample from the main stockpile   for the RCA 0/2 mm are shown in Table 1.
           of RCA 0/2 mm was conducted as follows. An area of
           approximately 4 × 4 meters in the 1/3 height (from ground) of   3.  DESCRIPTION OF THE CONSTRUCTION
           the pile was opened with a front end loader. From that opened   PROJECT AND THE CONCRETE MIX DESIGN
           area, 100 kg was taken manually with a spade ensuring that   USED
           samples were collected from 10 different sub-places in the 4x4
           meter area. The required volume (100 kg) was homogenised   L&T Construction has been awarded the CIDCO Housing
           by pouring it out on a cleaned concrete floor to prevent   Package 4 in Navi Mumbai under the Pradhan Mantri Awas
           contamination from the ground and turned upside down (end-  Yojana (PMAY). PMAY was launched to provide affordable
           over-end) minimum 3 times by the spade. The process was   housing for the urban population. The mission of this scheme
           conducted gently to ensure that the particles were not crushed.   is to provide housing to all in India by the end of 2022. Package
                                                                  4 is the largest order for construction under the PMAY scheme
           Table 1: Overview of the material properties tested    and consist of 22400 residential units with a built-up area of
                                                                  17 million sq. ft. Around 4.5 million sq. ft. in Package 4 is carried
           PARAMETER                     TEST METHOD
                                                                  out using L&T’s Precast Large Concrete Panel system. For this,
           Sieving analysis              IS 2386 Part 1           a temporary precast concrete factory with a pre-engineered
           Specific gravity              IS 2386 Part 3           building shed of about 11000 sq. m. has been constructed at the
                                                                  site, with a capacity to build 2.2 million sq. ft. of built-up area per
           Bulk density                  IS 2386 Part 3
                                                                  year.
           Moisture content              IS 2386 Part 3
           Water absorption              IS 2386 Part 3           The concrete mix design is specified in Table 2 and was suitably
                                                                  adjusted to accommodate the higher WA and the finer particle
           Particles < 75 µm             IS 2386 Part 1
                                                                  size distribution of fine RCA. This included water compensations
           Coal and lignite              IS 2386 Part 2           based on the determined WA and the actual moisture content
           Clay lumps                    IS 2386 Part 2           measured at the concrete mixing plant. The target w/b ratio
           Reduction in alkalinity       IS 2386 Part 7           was 0.50. The particle size of 0/2 mm RCA was used as it was
                                                                  the available sand fraction at the recycling wet process facility.
           Dissolved silica              IS 2386 Part 7
                                                                  Replacement levels of the CSS fractions by RCA 0/2 mm, were
           Soundness (Na 2 SO 4 ) after 5 cycles  IS 2386 Part 5  50 and 100% for M20 and M10, respectively. The specific gravity
           Acid soluble sulphate         EN 1744-1: 2009 + A1: 2012  of CSS and fine RCA sand was 2.64 and 2.52, respectively.
                                                                  Hence, preparing the RAC without changing the fine to coarse
           Acid soluble Chloride         IS 14959: 2001 Part 2
                                                                  ratio made an acceptable change in the yield of 0.6%. A total
           pH (5% solution)              In house method
                                                                  volume of 494 m  was casted with fine RCA. The grade-wise
                                                                               3
                                                                            THE INDIAN CONCRETE JOURNAL | JANUARY 2022  51