TECHNICAL PAPER                                            COLLECTOR’S EDITION





                                                                            were demoulded by turning the filled mould over
                                                                            on its side and the sleeper carried clear off the
                                                                            production area.


                                                                            PROCESS MECHANISED

                                                                            To satisfy the economic requirements for
                                                                            labour and material  saving, a new technique of
                                                                            manufacture had to be evolved introducing  the
                                                                            principles  of  mass-production.  In  1943  a  factory
                                                                            was designed on these  lines  ; each stage of the
                              Operators are using the hydraulic ramp for tensioning the
                              high-quality steel stressing wires used for reinforcement   process was fully mechanised, a close control of the
                              before the concrete is poured into moulds.    materials was obtained and the necessary methods
                                                                            to reduce the labour factor were introduced, not
                                                                            only by the use of plant but by a new process of
                                                                            manufacture, resulting from the research made,
                                                                            so that the characteristic feature of pre-stressing
                                                                            was improved and maintained at a constant level
                                                                            for each unit  produced. The factory  was built  at
                                                                            Tallington,  Stamford,  Lincolnshire  ;  work  on  its
                                                                            construction  was  commenced  in  October,  1943,
                                                                            and the factory was completed with full installation
                              A general view of the production centre, showing the   of plant in August 1944.
                              method of fixing the moulds and placing the concrete
                              which is vibrated to render a high consolidation.

















                              An oxyacetylene burner is used to separate sleepers
                              from each other after setting by cutting through the
                              reinforcement wires which are linking them together.
                                                                            Filled sleepers receive trowelling treatment and
                              After the detensioning, the removable end-plates   secondary vibration to assist consolidation of concrete
                              to the moulds were freed, and the wires burnt off   before setting, curing and hardening has taken place.
                              flush  to  the  concrete  by  an  oxyacetylene  cutter.
                                                                            The  Tallington  factory  has  a  manufacturing area
                              When the sleepers had been detached one from
                                                                            of  500  feet  long  by  140  feet  wide  and  allows  for
                              the other by the wires being cut through,  they
                                                                            20  production  lines,  each  accommodating  100


                                20    The Indian Concrete Journal | November 2018