                              Calculated deflections for each stage were incorrect,   References
                              largely through the fact that the box-section was   1.  Lee, D. J. Bending moments in beams of serial
                              constructed  in  three  separate  stages.  After  the   construction. Proceedings of the Institution of Civil
                              soffit had been placed, the webs were cast, then   Engineers, December 1967. Vol 38, pp. 621 -637.
                              the deck slab. The differential shrinkage between
                              these elements of different ages produced quite   2.  Fransen, B. The analysis of continuous frames
                              large errors in deflection calculations.        curved in plan. Thesis submitted for the MSc
                                                                              degree  of  the  University  of  New  Brunswick,
                              The approach spans and all piers were designed   September 1969.
                              by  the  Structure  Branch  of  the  New  Brunswick
                              Department  of  Public  Works.  The  author  in
                              association  with  Mr  C.  A.  Ponder  of  ADI  Limited,
                              Frederiction,  designed the  continuous girder.
                              Modern  Construction  Limited,  of  Moncton,  New
                              Brunswick,  were  the  general  contractors,  with
                              BBR  (Canada)  Limited  responsible  for  the  post-
                              tensioning.




                              Ralph M. Francis, PEng, Civil Engineering Department, University of New Brunswick, Fredericcon, New
                              Brunswick, Canada.